VDE certification
VDE is directly involved in the development of German national standards and is one of Europe's most experienced certification bodies with a high reputation in the world. It completes a total of 18,000 certification projects for nearly 2,200 German companies and 2,700 customers in other countries. So far, 200,000 electrical products in nearly 50 countries around the world have received the VDE mark.
Introduction to VDE Certification
The VDE Testing and Certification Institute in Offenbach, Germany is a research institute of the German Institute of Electrical Engineers (Verde Deutscher Elektrotechniker, VDE), founded in 1920. As a neutral, independent organization, VDE's laboratories inspect and certify electrical products in accordance with German VDE national standards or European EN standards, or IEC International Electrotechnical Commission standards. In many countries, the VDE certification mark is even more famous than the national certification mark, especially recognized and valued by importers and exporters.
In China, the diversification of the export direction of electrical products has made importers in Europe, Australia, Southeast Asia and other regions have proposed safety certifications such as GS (de), BEAB (English), IMQ (Italian) and CE marking. Most of the complete machine factories have turned these requirements into zero during the certification process, requiring their respective electrical safety parts suppliers to ensure a high level of safety certification mark, which is also the production of more and more parts. The company wants to get the reason for the VDE logo.
Test area for VDE
--Electric heating and electric appliances
--Data processing and medical equipment
--Lighting and electronics
--Cables and insulation materials
--Installation equipment and control devices
--Electronic components
--EMC test
VDE certification process
1 Submit the official application form and structural parameter list---is an important document for applying for VDE.
2 Application Confirmation---VDE will formally confirm the application within 2-4 weeks after receiving the formal application form and structural parameter list, and send invoices, factory inspection questionnaires and other information.
3 Sample delivery---When the VDE application is confirmed, it will inform the specific sample request and the relevant standards on which the test is based. After the sample is completed, it must be self-tested according to the standard requirements or submitted to the relevant domestic laboratory for prediction. After the prediction is passed, the samples can be safely and accurately sent to VDE for testing by express mail.
1) Once the test project is fully approved, the applicant will be notified at the first time.
2) The test results may also be defective. Some light defects, the certification body and VDE communication, with a slight correction, do not have to re-sample, VDE can issue certificates.
3) When there are important defects in the test results, the certification body will discuss the reasons for the failure with the applicant. If necessary, VDE will send the sample that failed the test for reference analysis. After the sample is modified and perfected, the re-inspection procedure is carried out, and the sample is sent again until it is qualified. If you re-send the sample within six months, the cost of retesting will be much more favorable.
4 Factory inspection----------------------------------------------------------------------- Prior to the factory review, the certification body appointed experts to assist the manufacturer in self-examination of production facilities, laboratory equipment, metering, and the entire quality system against VDE requirements. If the inspection is carried out, the inspectors will request the rectification and assist the manufacturer to discuss the rectification measures as soon as possible and implement them promptly until the re-inspection is passed.
5 Issuance of the certificate---If the sample test passes, the VDE will notify the applicant in time, and the VDE certificate will be issued soon.
Information to be submitted for VDE certification
Product description
2. Model difference description
3. Circuit diagram
4. German manual
5. Parts and materials list
6. CB test report
7. Other required materials
VDE certified factory review
In principle, VDE conducts factory inspections twice a year. The contents of the factory review mainly review the consistency of products and samples, but also review quality management documents such as inspection procedures, records, and measurements.
VDE certification does not match the matter
1. Poor hygiene
2. Poor safety conditions
3. Environmental protection is not up to standard
4. Chemical is not safe
5. No safety leader
6. No first aid training and fire drills
7. No PPE available and used
8. No MSDS
9. Overtime overtime
10. Wages are below the minimum wage
11. Illegal employment of child labor
12. Illegal use of last adult workers
13. Charge a deposit, seize an identity card or limit personal freedom
14. Search, corporal punishment, violation of workers' rights
15. Arrears of wages
16. No statutory benefits
17. "Three in one" factory, no safety devices for machinery and equipment
18. The hostel is crowded and the accommodation is poor.
19. At the end of the inspection by the local health department and issued a certificate
20. There are not enough toilets and bathing facilities
twenty one. Limited access
twenty two. No gender isolation
twenty three. Insufficient ventilation
twenty four. Unreasonable number and distribution of fire extinguishers and fire hydrants
25. Insecurity
VDE Certification Application Rules
1. First consultation --- The applicant provides the company with the company profile and the proposed status of the VDE product, such as the product model, name, parts list, drawings, working principle diagram, technical parameter table, instructions for use and so on.
2. Establish agency relationship---The entrusting party (applicant) signs an agency agreement with the agent to further clarify the duties, powers and obligations of both parties in a written contract to ensure that the two parties can cooperate closely in the application process, so that the application can be completed. Smoothly develop and achieve the intended purpose. At the same time, the power of attorney is the legal basis for the company to submit to VDE to prove that it has been entrusted by the applicant.
3. Formal application form and structural parameter list---is an important document for applying for VDE. Applicants can provide relevant information to the company for translation, and return it to VDE after being signed by the applicant.
4. Application Confirmation--- After VDE receives the formal application form and structural parameter list, it will formally confirm the application in about 2-4 weeks, and send invoices, factory inspection questionnaires and other information.
5. Sample delivery---When the VDE application is confirmed, it will inform the specific sample request and the relevant standards on which the test is based. The company can assist VDE applicants to obtain relevant standards and clarify all relevant test items and test methods. After the sample is completed, it must be self-tested according to the standard requirements or submitted to the relevant domestic laboratory for prediction. After the prediction is passed, the samples can be safely and accurately sent to VDE for testing by express mail.
1) Once the test project is fully approved, the applicant will be notified in a timely manner.
2) The test results may also be defective. Some light defects, communicate with VDE, with a little correction, you don't have to re-sample, VDE can issue certificates.
3) When there are important defects in the test results, the company will discuss the reasons for the failure with the applicant. If necessary, VDE will return the sample that failed the test for reference analysis. After the sample is revised and improved, the company will go through the re-inspection procedures and send samples again until it is qualified. If you re-send the sample within six months, the cost of retesting will be much more favorable.
6 Factory inspection----------------------------------------- Prior to the factory review, Shanghai Dexin will assist the manufacturer in self-examination of production facilities, laboratory equipment, metrology and the entire quality system against VDE requirements. If the inspection is carried out, the inspectors will request the rectification and assist the manufacturer to discuss the rectification measures as soon as possible and implement them promptly until the re-inspection is passed.
7 Issuance of the certificate---If the sample test passes, the VDE will promptly notify Shanghai Dexin, and the VDE certificate will be issued soon.
Shortcuts for getting VDE logos on electrical components
Generally speaking, there are two ways to carry out VDE-certified type approval experiments: the first way is for the company to directly consult and complete the application process with VDE, and send a considerable number of test samples to Germany according to the requirements of VDE testing engineers, according to Germany. The VDE standard is tested on a case-by-case basis and the total cost of the test is paid at the price of the German engineer based on the total time spent on the VDE test workload. The second way is that the company first submits a "CB test" application to a CB laboratory that has a good cooperative relationship with VDE in China, and then passes the CB test report to a VDE-certified type test report. We know that the CB test certificate is a certificate issued by the Certification Body Committee (CCB) of the International Electrotechnical Commission's Electrical Product Safety Certification Organization (IECEE), issued by a certification body accredited by IECEE-CCN in a country (in China, CCEE is the certification unit for CB test certificates. It is used together with the attached test report to inform other countries' certification bodies that samples of certain electrical products have been tested and tested in accordance with uniform IEC standards. The world has joined the CB system by more than 30 countries. VDE is also a CB member laboratory. Therefore, the CB test report issued by us can basically be directly accepted, so the testing of major projects can be completed in China. However, if there are individual differences between individual DIN standards and IEC standards in Germany, the VDE engineer will notify the agent to send individual samples to supplement the difference test items, and then the test results can be comprehensively confirmed.
Comparing the two methods, it is easy to see that the first way to apply for VDE is because it is an overseas test. It is difficult for the enterprise to understand the whole experiment. In addition, the possibility of detecting VDE once is relatively small, so it is necessary to reciprocate. When sending samples to overseas, the project cycle is difficult to control. In addition, VDE German technicians have a higher labor cost per unit than domestic technicians, so the total cost may be higher. The second method seems to be divided into two stages of domestic testers' foreign supplements. In fact, it utilizes the advantages of domestic local test stations that are relatively familiar with the technical status of products, and can improve the problems in time when problems are discovered, as well as domestic and foreign labor prices. Advantages such as poor conditions. Through the operation of some practical projects, it has been proved that using the CB test report to apply for VDE certification can be said to be a shortcut that is both time-saving and economical.
TEL:0760-22328080
Mobile phone:15914655546
QQ:1852423249
mailbox:15914655546@163.com
address:No.309 , 3rd Floor ,Building 1 , Ruifeng LED E-Commerce Center , Guzhen Town , Zhongshan City , Guangdong Province , China.